MAP: nisps/pipeline entry + manifold engine listing; ALIGNMENT: curve-maths unification note; plan gate evidence incl. the proven-inherent f32 momentum drift and parity stage 7. |
||
|---|---|---|
| .. | ||
| adr | ||
| redesign | ||
| specs | ||
| AGENT-REFERENCE.md | ||
MAP: nisps/pipeline entry + manifold engine listing; ALIGNMENT: curve-maths unification note; plan gate evidence incl. the proven-inherent f32 momentum drift and parity stage 7. |
||
|---|---|---|
| .. | ||
| adr | ||
| redesign | ||
| specs | ||
| AGENT-REFERENCE.md | ||