- plan P2 marked landed (hardware timing spot-check deferred to the chokepoint-B session on physical MEMLNaut) - ALIGNMENT: defect #3 resolved by the runtime-shaped browser MLP - MAP/AGENT-REFERENCE/nisps-wasm-README: describe the honoured-dims create + reshape ABI; note per-mode dims become schema-real at P5 - fresh wasm artifacts from the gate run |
||
|---|---|---|
| .. | ||
| _archive | ||
| plans | ||
| recon | ||
| aimmersive-clone-spec.md | ||
| backends-spec.md | ||
| dock-spec.md | ||
| engine-architecture.md | ||
| feedback-modes-port-spec.md | ||
| inputs-spec.md | ||
| MAIN.md | ||
| manifold-parity-features-spec.md | ||
| slp-workshop-firmware.md | ||
| useq-cv-protocol.md | ||
| vcv-module.md | ||