memlnaut-nisps/docs
monkey-w1n5t0n 7e957457cd docs: P2 complete — burn down plan, close ALIGNMENT defect #3 (fixed WASM arity)
- plan P2 marked landed (hardware timing spot-check deferred to the
  chokepoint-B session on physical MEMLNaut)
- ALIGNMENT: defect #3 resolved by the runtime-shaped browser MLP
- MAP/AGENT-REFERENCE/nisps-wasm-README: describe the honoured-dims
  create + reshape ABI; note per-mode dims become schema-real at P5
- fresh wasm artifacts from the gate run
2026-07-14 03:56:04 +02:00
..
adr docs: restructure design docs into docs/specs (adr/plans/recon), update path references 2026-07-13 23:15:46 +03:00
redesign docs: restructure design docs into docs/specs (adr/plans/recon), update path references 2026-07-13 23:15:46 +03:00
specs docs: P2 complete — burn down plan, close ALIGNMENT defect #3 (fixed WASM arity) 2026-07-14 03:56:04 +02:00
AGENT-REFERENCE.md docs: P2 complete — burn down plan, close ALIGNMENT defect #3 (fixed WASM arity) 2026-07-14 03:56:04 +02:00