- plan P2 marked landed (hardware timing spot-check deferred to the chokepoint-B session on physical MEMLNaut) - ALIGNMENT: defect #3 resolved by the runtime-shaped browser MLP - MAP/AGENT-REFERENCE/nisps-wasm-README: describe the honoured-dims create + reshape ABI; note per-mode dims become schema-real at P5 - fresh wasm artifacts from the gate run |
||
|---|---|---|
| .. | ||
| adr | ||
| redesign | ||
| specs | ||
| AGENT-REFERENCE.md | ||