Plan §5 names an inventory of the load-bearing memllib surface as the
prerequisite for the vendor-vs-fork-pin decision. Built it from the firmware
LINKER MAP rather than grep — the same method that would have caught daisysp
(S8) mechanically instead of by reading.
Result: all 24 compiled translation units contribute kept sections to the image;
no discarded-only TU exists. memllib is not a daisysp situation. "The
load-bearing subset" is ~1.8 MB across 84 files — essentially all of memllib
minus examples/. There is no small subset to lift; synth/ alone is 1.3 MB and
all three of its TUs link.
The wrinkle, which was not visible when §7.5 was decided: src/memllib is not a
third-party dependency, it is the LAB's shared library
(MusicallyEmbodiedML/memllib), and our fork is 3 commits ahead but 31 commits
BEHIND — +2034/-153 across exactly the files we link, including "new staticmlp",
"jolts", "noise", "verb". Vendoring as-is freezes that gap permanently.
Recommendation recorded: rebase the three small NISPS commits onto upstream main
FIRST, then vendor. Same self-contained end state, but it does not silently
discard work that sounds directly relevant, and it is the only moment that merge
is cheap — after vendoring there is no upstream history to merge against.
Flagged for an operator call before the PlatformIO cut, which this gates.
MAP.md: codegen's generated/ now owns ParamSchema and the per-mode MLP aliases;
new shared headers (dsp/ratio_seq.hpp, dsp/seq_clock.hpp, core/event_queue.hpp
with a note on why it is deliberately not RingBuffer); backends/base-backend.ts;
the seed script and codegen/templates bullets removed; the synth-midi-cc.json
path corrected to its sources/ subdir.
Plan §4 burned down. S26 is NOT done — it is now an operator decision with the
per-field inventory that makes it cheap, recorded in the plan: default_spread is
already wired (the audit's "zero consumers" was a quarter wrong);
default_learning_rate/default_max_iterations are unread but every schema carries
exactly the values already hardcoded, so wiring them is numerically a no-op
today; input_channels is codegen-time-validated and carries real meaning for
sound_analysis_midi; and per-param curve is a trap — it is descriptive of
squaring the engines already do internally, so wiring it would double-apply on
35 params.
Plan §3 marked burned down, noting where execution departed from the written
plan and why: L35 deleted rather than relocated (zero consumers), and S35's
describe ABI widening forcing two out-of-scope buffer fixes. Also records the
package.json test-glob bug found en route — new unit tests were silently not
being run.
ALIGNMENT defect 5's trailing sentence updated: the behaviour bugs it listed as
pending are fixed.
Phase 0 of the 2026-07 simplification audit (plan §1). CI has been 100% red on
main since 2026-07-13 and every "gates green" claim since rested on local runs.
- S7 / critic gap 2: push memllib `feat/nisps-core-swap` (3 commits incl. the
pin b37fc53) to monkey-w1n5t0n/memllib and repoint .gitmodules at the fork.
Those commits existed on exactly one disk; `git ls-remote` now resolves the
pin, so `submodules: recursive` checkout and fresh clones work again. Drops
the compensating unreachable-pin error paragraph in build-firmware-arch.sh.
- S24 / S31: the manifold-tests job regenerates from schemas/, runs the codegen
golden test, and fails on a dirty diff — the "schema changes ship with both
generated outputs" rule is now enforced rather than assumed.
- S32: a WASM freshness gate runs the parity harness against the *committed*
manifold/public/nisps.{js,wasm} before the CI rebuild overwrites it. That
artifact is what the webhook ships to production, so a stale commit now fails
loudly instead of shipping.
- critic gap 3 / operator decision §7.4: the VPS webhook
(~/.config/webhooks/meml-deploy.sh, not in this repo) waits for the `CI`
workflow to conclude success on the pushed SHA before building. Fail-closed;
MEML_SKIP_CI_GATE=1 for an emergency hand-deploy. Verified the gate query
returns `failure` for fa37047, i.e. it would have blocked that deploy.
- S31: corrected run-all-tests.sh's false "single command CI invokes" header.
Docs moved with the code: ALIGNMENT defect 1 deleted (resolved) and the rest
renumbered; MAP.md's unreachable-pin warning replaced with the fork pin and a
pointer to the §7.5 vendoring decision; ONBOARDING documents the deploy gate
and the tracked-WASM-ships-to-prod hazard; plan §1 marked burned down.
Gates: scripts/run-all-tests.sh ALL GREEN (ctest 4/4, parity 1273 floats within
1e-5, lint, typecheck, 33 Playwright specs).